Format-Led Selection
Independent label supply, buffering and liner take-up support stable web movement.

Automatic labeling systems for pharmaceutical, food and personal-care containers. Bottle separation, sensing, label application and downstream transfer are coordinated by PLC control.
Discuss This Equipment See Specifications ↓Independent label supply, buffering and liner take-up support stable web movement.
Adjustable bottle separation, conveyor and label speeds simplify setup.
Optional batch/date coding and missing-label or missing-print inspection.
| Parameter | Reference Configuration |
|---|---|
| Output | 200-500 bottles/min (2 mL vials); >=200 pcs/min (container and label dependent) |
| Labeling Accuracy | +/-0.5 mm; +/-1.0 mm (excluding container/label variation) |
| Container Dimensions | Length 20-85 mm / diameter 10-30 mm; Length 40-300 mm / diameter 40-100 mm |
| Label Dimensions | Height 20-90 mm; Length 25-90 mm; Height 30-140 mm; Length 20-280 mm |
| Label Roll Core Diameter | dia.76 mm |
| Label Roll Outer Diameter | dia.420 mm; max. dia.350 mm |
| Bottle Breakage | <1 in 200,000 |
| Supply Voltage | 220 V/380 V50/60 Hz; AC220 V50 Hz/60 Hz |
| Power Consumption | 2.3 kW; AC 220 V, 50/60 Hz, single phase; 1500W |
| Air Pressure | 5-7 kg/cm² |
| Control System | PLC |
| Drive System | servo motor control |
| Speed Control | VFD, stepless speed adjustment |
| Synchronization | Fully synchronized linked operation |
Brochure-listed values vary by configuration. Confirm the selected format, utilities, output and acceptance conditions in the quotation.
Independent label supply, buffering and liner take-up support stable web movement.
Adjustable bottle separation, conveyor and label speeds simplify setup.
Optional batch/date coding and missing-label or missing-print inspection.
Automatic nonconforming-product rejection and downstream cartoner connection.
The following configuration discussions use the supplied product and detail images. Availability is reviewed for the selected equipment.

Review drawings and representative samples before selecting the tooling and container range.

Review access, transfer and the process features required for the proposed configuration.

Agree the operating rate and acceptance conditions for the complete process, including connected equipment.
Send the actual product format, material and operating requirements so suitability can be reviewed for this application.
Explore Applications ↗Send the actual product format, material and operating requirements so suitability can be reviewed for this application.
Explore Applications ↗Send the actual product format, material and operating requirements so suitability can be reviewed for this application.
Explore Applications ↗Glass and plastic containers can require different presentation and label or ink choices. Surface treatment, curvature and product storage conditions should be included in the application trial.
Compare the same format, throughput, contact conditions and operating scope. Similar equipment names do not establish interchangeability.
Review The Selection Checklist ↗
Work with a team that connects container requirements, processing equipment and downstream handling in one project discussion.
Request available footage relevant to the selected equipment and process.
Confirm preservation, protective packing, shipment split, lifting points and transport conditions in the agreed order scope. Review installation access and the equipment layout before dispatch; final packing dimensions and delivery dates are provided for the confirmed configuration.
Reference the agreed layout, configuration, inspection points and documentation in the order.
Agree preservation, lifting access, shipment split and packing dimensions for the confirmed equipment.
Coordinate delivery terms, receiving access, utilities and the installation responsibilities.
Provide the container, label or artwork, print material, position tolerances and required line speed. Application trials establish the suitable setup.
Label roll core diameter: dia.76 mm. These are brochure-listed values; confirm the complete format range for the intended configuration.
Listed rates are selection references. Actual output depends on the material, format, process settings and integrated line conditions; agree the acceptance conditions before ordering.
Interface feasibility requires a layout and control review. Submit conveyor heights, transfer direction, utilities and upstream/downstream equipment details so the integration scope can be defined.
Include drawings and samples, required output, process targets, utilities, installation location, documentation needs and delivery destination. This supports a configuration-specific quotation.
Local operating conditions and documentation requirements belong in the enquiry from the beginning. Discuss the requirements for your destination with our team.
Machine access, electrical requirements and documentation scope.
Project standards, language requirements and the conformity documentation needed for the proposed supply.
Utilities, environmental conditions and import documentation.
Format flexibility, operator access and production-line interfaces.
Installation planning, parts requirements and export packing scope.
Start with the drawing, material and format range. Identify the neck, body, closure or packaging requirements that affect the machine.
Define the target process, production rate and acceptance conditions. Compare complete configurations rather than isolated catalogue numbers.
Discuss transfer direction, utilities, operating access and interfaces to upstream and downstream equipment.
Agree the quotation scope, inspection plan, packing, destination and installation responsibilities for the selected equipment.

Vertical Self-Adhesive Labeler supports printing and labeling projects.
View Product Details ↗
Inclined Self-Adhesive Labeler supports printing and labeling projects.
View Product Details ↗
Ampoule Enamel Printing And Sintering Machine supports printing and labeling projects.
View Product Details ↗Share your container drawing, output target and process requirements. Start with the scope that matters to your project.
Get A Project Quote