Format-Led Selection
Ceramic or peristaltic pump configurations with online dose adjustment.

An automated platform for vial infeed, liquid filling, stoppering and three-knife crimp sealing. Profiled filling and rising needles help control splashing and foam.
Discuss This Equipment See Specifications ↓Ceramic or peristaltic pump configurations with online dose adjustment.
Servo robotic stoppering with secondary pressing supports consistent closure.
Cap-retention measures and three-knife crimping promote stable sealing.
| Parameter | Reference Configuration |
|---|---|
| Container Capacity | 1-100 mL |
| Filling Heads | Configured to required output |
| Filling Accuracy | +/-1% |
| Filling Method | Ceramic or peristaltic pumps |
| Stopper Positioning Accuracy | Servo driven; repeat positioning: 0.2 mm |
| Cap-placement Acceptance | >=99.5% |
| Crimp Acceptance | >=99.5% |
| No-vial/no-fill Interlock | 100% |
| No-vial/no-crimp Interlock | 100% |
| Supply / Power | 380 V/AC |
Brochure-listed values vary by configuration. Confirm the selected format, utilities, output and acceptance conditions in the quotation.
Ceramic or peristaltic pump configurations with online dose adjustment.
Servo robotic stoppering with secondary pressing supports consistent closure.
Cap-retention measures and three-knife crimping promote stable sealing.
PLC control includes four access levels and multiple product recipes.
The following configuration discussions use the supplied product and detail images. Availability is reviewed for the selected equipment.

Review drawings and representative samples before selecting the tooling and container range.

Review access, transfer and the process features required for the proposed configuration.

Agree the operating rate and acceptance conditions for the complete process, including connected equipment.
Send the actual product format, material and operating requirements so suitability can be reviewed for this application.
Explore Applications ↗Send the actual product format, material and operating requirements so suitability can be reviewed for this application.
Explore Applications ↗Send the actual product format, material and operating requirements so suitability can be reviewed for this application.
Explore Applications ↗Glass and polymer containers can differ in rigidity, surface behavior and temperature tolerance. Handling and metering setup must be reviewed with actual samples; suitability for either material is not implied unless listed in the selected configuration.
Compare the same format, throughput, contact conditions and operating scope. Similar equipment names do not establish interchangeability.
Review The Selection Checklist ↗
Work with a team that connects container requirements, processing equipment and downstream handling in one project discussion.
Request available footage relevant to the selected equipment and process.
Confirm preservation, protective packing, shipment split, lifting points and transport conditions in the agreed order scope. Review installation access and the equipment layout before dispatch; final packing dimensions and delivery dates are provided for the confirmed configuration.
Reference the agreed layout, configuration, inspection points and documentation in the order.
Agree preservation, lifting access, shipment split and packing dimensions for the confirmed equipment.
Coordinate delivery terms, receiving access, utilities and the installation responsibilities.

Match The Dose, Container And Closure In One Filling Plan
Explore Equipment ↗
Match The Dose, Container And Closure In One Filling Plan

Match The Dose, Container And Closure In One Filling Plan

Match The Dose, Container And Closure In One Filling Plan
The formulation, dose, viscosity, foaming tendency, container drawing and closure samples determine the metering and handling requirements.
Container capacity: 1-100 mL. These are brochure-listed values; confirm the complete format range for the intended configuration.
Listed rates are selection references. Actual output depends on the material, format, process settings and integrated line conditions; agree the acceptance conditions before ordering.
Interface feasibility requires a layout and control review. Submit conveyor heights, transfer direction, utilities and upstream/downstream equipment details so the integration scope can be defined.
Include drawings and samples, required output, process targets, utilities, installation location, documentation needs and delivery destination. This supports a configuration-specific quotation.
Local operating conditions and documentation requirements belong in the enquiry from the beginning. Discuss the requirements for your destination with our team.
Machine access, electrical requirements and documentation scope.
Project standards, language requirements and the conformity documentation needed for the proposed supply.
Utilities, environmental conditions and import documentation.
Format flexibility, operator access and production-line interfaces.
Installation planning, parts requirements and export packing scope.
Start with the drawing, material and format range. Identify the neck, body, closure or packaging requirements that affect the machine.
Define the target process, production rate and acceptance conditions. Compare complete configurations rather than isolated catalogue numbers.
Discuss transfer direction, utilities, operating access and interfaces to upstream and downstream equipment.
Agree the quotation scope, inspection plan, packing, destination and installation responsibilities for the selected equipment.

A linear vial filling and stoppering machine with intermittent rack positioning, servo-driven metering and robotic rubber-stopper insertion.
View Product Details ↗
An integrated intermittent filling and crimp-capping platform for essential-oil bottles, cosmetic glass containers and compatible oral liquid formats..
View Product Details ↗
A linked production system for tubular cosmetic bottles, essential oils, serums and compatible oral liquid containers.
View Product Details ↗Share your container drawing, output target and process requirements. Start with the scope that matters to your project.
Get A Project Quote